Construction progress

The following photos have been collected to reflect the construction progress of the US 17 Bypass. Please refer to this site regularly for updated progress photos. Please click on individual photos to view a larger image.

Work Ongoing During June 2004


Shows joint area of segmental span #42-14 up and the conventional bridge.

Placing hydraulic jack on tendon strands at the joint area of segment #42-14 up and the conventional bridge span.

Shows hydraulic jack set to stress tendon cables at the bulkhead wall of the segmental pier table at bent #42.

Shows joining of segmental to conventional construction.

Looking north from the N.E. Cape Fear River at the segmental construction at bent #42.

Looking south from the bent #41 pier table deck. Shows work at bent #40 and conventional bridge construction towards end bent #1.

Looking down from the bent #41 pier table deck. Shows end of work bridge from the end bent #1. Work bridge out to between bents #40 and 41.

Looking south from bent #42 segment #14 down. Shows bent #41 pier table with tendon duct in the upper portion of the bulkhead.

Looking south at the Rockhill Road Bridge construction.