Construction progress

The following photos have been collected to reflect the construction progress of the US 17 Bypass. Please refer to this site regularly for updated progress photos. Please click on individual photos to view a larger image.

Work Ongoing During June 2003


Looking east at south end of pier table on bent #42. Reinforcing bars will extend into first segment south of table. (orange caps are for safety and will be removed.)

Looking north across the form for the top of the pier table. This is at elevation 27.5 meters or about 92 feet above the river.

Looking south from top of bent #42. Shows work on bent #41. Will be the same as bent #42. Footer has been poured and reinforcing steel being set for stem walls. (light area in center of the picture is work at end bent #1 side at US 421 – about a mile away.)

Looking south from bent #43 at the silhouette of bent #42.