Construction progress

The following photos have been collected to reflect the construction progress of the US 17 Bypass. Please refer to this site regularly for updated progress photos. Please click on individual photos to view a larger image.

Work Ongoing During July 2004


Wide view of the segmental structure on bent #42. Conventional structure to the right and bent #41 to the left.

Pier table at bent #41. Falsework on bent #40 to the left.

Looking up from the footing of bent #41 at the brackets and beams of the falsework of the pier table.

Preparing to pour the last drilled shaft on the mainline. This is bent #39. 38 shafts remain on the US 421 ramp.

Setting column form at bent #34.

Looking north from bent #32.

Looking south from bent #34.

Looking along the joint between the segmental structure on the right and the conventional structure on the left.

Looking south from bent #43.